Project Name

FSTP based on Tiger Bio Filter technology

Amount
₹1,44,24,685.00
Ward Name
n/a
Physical Progress
75
Financial Progress
16
View on Google Map
Project Name

Multiutility Building at Barpeta Road under 10 % Central pool fund for the year 2009

Amount
₹4,84,45,950.00
Ward Name
6
Physical Progress
91
Financial Progress
76
View on Google Map
Project Name

Market Complex at Ward No.9, Barpeta Road Under 5th ASFC

Amount
₹4,00,00,000.00
Ward Name
9
Physical Progress
80
Financial Progress
60
View on Google Map
Project Name

MRF & W2C plant

Amount
₹1,33,17,000.00
Ward Name
n/a
Physical Progress
30
Financial Progress
0
View on Google Map
Project Name

Processing and Treatment of legacy waste

Amount
₹2,00,00,000.00
Ward Name
n/a
Physical Progress
40
Financial Progress
0
View on Google Map
Project Name

Market Complex near Barpeta Road Bus Stand (Block A)

Amount
₹99,97,000.00
Ward Name
5
Physical Progress
75
Financial Progress
40
View on Google Map
Project Name

Market Complex Near Barpeta Road Bus Stand (Block B)

Amount
₹98,69,135.00
Ward Name
5
Physical Progress
50
Financial Progress
50
View on Google Map
Project Name

Cable Suspension Foot Bridge at Bishnu-Jyoti Sarovar

Amount
₹64,72,000.00
Ward Name
5
Physical Progress
70
Financial Progress
48
View on Google Map
Project Name

Clock Tower

Amount
₹39,48,000.00
Ward Name
5
Physical Progress
60
Financial Progress
View on Google Map
Project Name

Construction of R.C.C. Drain with cover slab by the west side of Road No. 59 (Wholesale vegetable Market) leading from pay and used toilet to P.W.D. Road in Ward No. 9, under 15th Finance 2nd installment for the year 2020-21 during the 2021-22. (Chainage 0.00 M. to 150.30 M.)

Amount
₹25,25,500.00
Ward Name
9
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of R.C.C. drain with cover slab by the south side of Road No. 1 leading from Roy Verity to Rash Mandir in Ward No. 6, under 15th Finance for the year 2020-21 during the year 2021-22. (Chainage 0.00 M. to 135.00 M.)

Amount
₹13,94,000.00
Ward Name
6
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Development of Road by paver block at Road No. 59 leading from P.W.D Road to CRPF Camp (Wholesale vegetable market) in Ward No. 9, under 15th Finance 2nd installment for the year 2020-21 during the year 2021-22. (Chainage 0.00 M. to 90.00 M.)

Amount
₹11,73,700.00
Ward Name
9
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Development of Road by paver block at Road No. 73 with link road to Burel Ground in Ward No. 4 under 15th Finance 2nd installment for the year 2020-21 during the year 2021-22. (Chainage 0.00 M. to 212.00 M.)

Amount
₹12,36,000.00
Ward Name
4
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Development of Road by interlocking paver block with R.C.C. culvert and divider leading from Road No. 1 to P.W.D. Road in Ward No. 6 (infront of BSNL office), under 15th Finance 2nd installment for the year 2020-21 during the year 2021-22. (Chainage 0.00 M. to 175.00 M.)

Amount
₹30,80,600.00
Ward Name
6
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Development of beautification at Bishnujyoti Sarobar (East and South side) Part in Ward No. 5, under 15th Finance 2nd installment for the year 2020-21 during the year 2021-22. (Chainage 0.00 M. to 80.00 M.)

Amount
₹8,35,000.00
Ward Name
5
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Computer Centre at Barpeta Road Municipality Board Ward No – 5 Under 15th F.C. for the year 2020-2021 during the year 2021-2022

Amount
₹7,58,000.00
Ward Name
5
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Development of Existing Brick Drain (Raising) at Road No. 32 & 75 from (Sri Nabadeep Barman house to Gobinda Mandir at Barman Para, Ward No. 8) under 15th Finance 2nd installment for the year 2020-21 during the year 2021-22. (Chainage 0.00 M. to 250.00 M.)

Amount
₹10,32,000.00
Ward Name
8
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of R.C.C. Drain with cover slab by North side of Road No. 17, leading from Road No. 1 to Jaganath House (Near Sani Mandir) under 15th Finance for the year 2020-21 during the year 2021-22. (Chainage 0.00 M. to 150.00 M.)

Amount
₹10,74,900.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Cement Concrete Road at byelane of Down Town Road leading from Sangha Swargiary house to towards end point of the town in Ward No. 3, under 15th Finance 2nd installment for the year 2020-21 during the year 2021-22. (Chainage 0.00 M. to 100.00 M.)

Amount
₹7,38,300.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Brick drain and culvert with R.C.C. slab by the East side of Road No. 44 leading from Dipak Ghosh house towards Sani Mandir in Ward No. 1, under 15th FC 2nd installment (Last Part) of untied basic grant for the year 2021-22 during the year 2021-22.

Amount
₹7,08,000.00
Ward Name
1
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Const. of R.C.C drain with cover slab south side of Road No. 8 leading from P.W.D. Manas Road to Road No. 69 in Ward No. 2 under 15th FC 2nd installment (Last Part) of untied basic grant for the year 2021-22 during the year 2021-22. (Phase-I)

Amount
₹6,59,000.00
Ward Name
2
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Const. of underground drain with R.C.C. slab leading from M.B Road to Bijay Mandal house at ward No. 3 under 15th FC 2nd installment (Last Part) of untied basic grant for the year 2021-22 during the year 2021-22.

Amount
₹6,99,700.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Const. of R.C.C. covered drain leading from Himangshu Thakuria house to Power house culvert at ward No. 4 under 15th finance untied fund for the year 2021-22.

Amount
₹6,99,500.00
Ward Name
4
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Const. of R.C.C covered drain leading from Marwari Samshan to Sampad Choudhury house at ward No. 5 under 15th FC 2nd installment (Last Part) of untied basic grant for the year 2021-22 during the year 2021-22.

Amount
₹6,99,500.00
Ward Name
5
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Const. of R.C.C covered drain leading from Dulali Paul house to Girish Das house at ward No. 6 under 15th FC 2nd installment (Last Part) of untied basic grant for the year 2021-22 during the year 2021-22.

Amount
₹6,98,400.00
Ward Name
6
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Const. of underground drain with C.C. road leading from Biplob Sarkar house to Gopal Das house at ward No. 7 under 15th FC 2nd installment (Last Part) of untied basic grant for the year 2021-22 during the year 2021-22.

Amount
₹7,05,200.00
Ward Name
7
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC cover drain leading from Chandanpur Chariali to Sudhangshu Barman house (West Side) in Ward No. 8, Barpeta Road under 15th FC 2nd installment (Last Part) of untied basic grant for the year 2021-22 during the year 2021-22.

Amount
₹7,00,000.00
Ward Name
8
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of R.C.C. drain with cover slab cum paved road leading from P.W.D. Manas Road to Haidar Ali house in Ward No. 9 under 15th FC 2nd installment (Last Part) of untied basic grant for the year 2021-22 during the year 2021-22.

Amount
₹6,67,000.00
Ward Name
9
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Const. of underground drain with C.C. Road leading from Praneswar Mandal house to Paresh Mandal house at ward No. 10 under 15th FC 2nd installment (Last Part) of untied basic grant for the year 2021-22 during the year 2021-22.

Amount
₹6,99,000.00
Ward Name
10
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC drain with slab cum paved road leading from Subir Chakraborty house to Suman Dutta house in Ward No. 1, 15th FC 2nd installment of untied basic grant for the year 2021-22 during the year 2022-23. (Phase-III)

Amount
₹6,17,000.00
Ward Name
1
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of brick drain with RCC slab cum paved road leading from Road No. 8 to Babul Barman house in Ward No. 1, 15th FC 2nd installment of untied basic grant for the year 2021-22 during the year 2022-23.

Amount
₹3,57,500.00
Ward Name
1
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC drain by the South side of Road No. 8 leading from Road no. 43 towards Sankar Ghosh house in Ward No. 2, under 15th FC 2nd installment of untied basic grant for the year 2021-22 during the year 2022-23. (Phase-III)

Amount
₹9,56,500.00
Ward Name
2
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Block Road leading from Pratap Majumdar house to Dr. Rezaul Karim house via Abdul Rezzak in Ward No. 3, 15th FC 2nd installment of untied basic grant for the year 2021-22 during the year 2022-23.

Amount
₹9,97,200.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Renovation and upgradation of existing drain with RCC slab from Arabinda Sangha to Surja Saha house in Ward No. 4, 15th FC 2nd installment of untied basic grant for the year 2021-22 during the year 2022-23.

Amount
₹9,95,100.00
Ward Name
4
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC cover drain leading from Banowari Lal Maheswari house to Basudew Maheswari house in Ward No. 5, 15th FC 2nd installment of untied basic grant for the year 2021-22 during the year 2022-23.

Amount
₹9,98,500.00
Ward Name
5
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of CC road with underground drain remaining part of Sweeper road back side of Bhagirath Das house in Ward No. 6, 15th FC 2nd installment of untied basic grant for the year 2021-22 during the year 2022-23.

Amount
₹5,95,000.00
Ward Name
6
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Raising of brick drain and cover slab leading from Anchalik Namghar to Dr. Datyari Das house in Ward No. 6, Barpeta Road under 15th FC 2nd installment of untied basic grant for the year 2021-22 during the year 2022-23. (Phase-III)

Amount
₹4,03,300.00
Ward Name
6
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC drain with cover slab leading from Bishu Saha Mill to Basudev Saha house at Shyamapalli in Ward No. 7, 15th FC 2nd installment of untied basic grant for the year 2021-22 during the year 2022-23.

Amount
₹9,98,500.00
Ward Name
7
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Raising of existing drain leading from Pradip Saha house to Subal Saha house in Ward No. 8, under 15th FC 2nd installment of untied basic grant for the year 2021-22 during the year 2022-23.

Amount
₹5,05,700.00
Ward Name
8
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Raising of existing drain leading from Harish Barman house to Prakash Mitra Industry in Ward No. 8, under 15th FC 2nd installment of untied basic grant for the year 2021-22 during the year 2022-23.

Amount
₹5,05,700.00
Ward Name
8
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Development of road by paver block infront of Dulal Sarkar house in Ward No. 9, 15th FC 2nd installment of untied basic grant for the year 2021-22 during the year 2022-23.

Amount
₹1,28,800.00
Ward Name
9
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Box type culvert at Al Amin Nagar in Ward No. 9, 15th FC 2nd installment of untied basic grant for the year 2021-22 during the year 2022-23.

Amount
₹2,70,000.00
Ward Name
9
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of R.C.C. drain with cover slab by west side of Road No. 79 to leading from P.W.D. Road towards Road No. 43 in Ward No. 9 under 15th FC 2nd installment of untied basic grant for the year 2021-22 during the year 2022-23. (Phase-II)

Amount
₹5,92,000.00
Ward Name
9
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of drain with slab from Sumanta Saha house to Subash Mitra house in Ward No. 10, under 15th FC 2nd installment of untied basic grant for the year 2021-22 during the year 2022-23.

Amount
₹9,98,500.00
Ward Name
10
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Development of road at Road No. 68 leading from Jagabandhu house to Manik Chakraborty house in Ward No. 1 under 15th FC 1st installment of untied basic grant for the year 2021-22 during the year 2022-23.

Amount
₹3,37,000.00
Ward Name
1
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC drain with slab cum paved road leading from Dulal Saha house to Abhijit Saha house in Ward No. 1, under 15th FC 1st installment of untied basic grant for the year 2021-22 during the year 2022-23.

Amount
₹6,83,500.00
Ward Name
1
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of CC road leading from Abhijit Saha house to Bhajan Mitra house in Ward No. 1, under 15th FC 1st installment of untied basic grant for the year 2021-22 during the year 2022-23.

Amount
₹3,29,500.00
Ward Name
1
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC drain by the South side of Road No. 8 leading from Road no. 43 towards Sankar Ghosh house in Ward No. 2, under 15th FC 1st installment of untied basic grant for the year 2021-22 during the year 2022-23. (Phase-I)

Amount
₹6,11,500.00
Ward Name
2
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC drain by the South side of Road No. 8 leading from Road no. 43 towards Sankar Ghosh house in Ward No. 2, under 15th FC 1st installment of untied basic grant for the year 2021-22 during the year 2022-23. (Phase-II)

Amount
₹6,30,000.00
Ward Name
2
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC cover drain leading from Kalahabhanga cremation ground transformer to Paresh Das house via Sunil Arjya house in Ward No. 3, Barpeta Road under 15th FC 1st installment of untied basic grant for the year 2021-22 during the year 2022-23

Amount
₹12,98,500.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of under ground drain with Cc paved road leading from Uttam Saha house to Rabindra Sarobar in Ward No. 4, Barpeta Road under 15th FC 1st installment of untied basic grant for the year 2021-22 during the year 2022-23 (Phase-IV)

Amount
₹13,06,400.00
Ward Name
4
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of interlocking paver block road leading from Road No. 2 to PWD main road infront of Droupadi Bhawan in Ward No. 5, Barpeta Road under 1st installment of untied basic grant (15th FC) for the year 2021-22 during the year 2022-23.

Amount
₹12,89,000.00
Ward Name
5
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Raising of brick drain and cover slab leading from Anchalik Namghar to Dr. Datyari Das house in Ward No. 6, Barpeta Road under 15th FC 1st installment of untied basic grant for the year 2021-22 during the year 2022-23

Amount
₹12,97,000.00
Ward Name
6
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC cover drain leading from Dinamani L.P. School to Pankaj Saha house in Ward No. 7, Barpeta Road under 15th FC 1st installment of untied basic grant for the year 2021-22 during the year 2022-23

Amount
₹9,31,200.00
Ward Name
7
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of CC road leading from Kanailal Jain house to Ranjit Karmakar house (Aranyak) in Ward No. 7, Barpeta Road under 15th FC 1st installment of untied basic grant for the year 2021-22 during the year 2022-23

Amount
₹3,40,500.00
Ward Name
7
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC cover drain leading from 2 No. Babupara to Bijoy kumar Saha house in Ward No. 8, Barpeta Road under 15th FC 1st installment of untied basic grant for the year 2021-22 during the year 2022-23

Amount
₹12,98,500.00
Ward Name
8
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of R.C.C. drain with cover slab by west side of Road No. 79 to leading from P.W.D. Road towards Road No. 43 in Ward No. 9 under 15th FC 1st installment of untied basic grant for the year 2021-22 during the year 2022-23.

Amount
₹6,25,000.00
Ward Name
9
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of R.C.C. drain with cover slab by east side of Road No. 79 to leading from P.W.D. Road towards Road No. 43 in Ward No. 9 under 15th FC 1st installment of untied basic grant for the year 2021-22 during the year 2022-23.

Amount
₹6,24,000.00
Ward Name
9
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of CC road with under ground drain leading from Kalidas Debnath house to Gobinda Debnath house in Ward No. 10, Barpeta Road under 15th FC 1st installment of untied basic grant for the year 2021-22 during the year 2022-23

Amount
₹7,52,000.00
Ward Name
10
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC drain with cover slab cum paved at bye land of PWD Road leading from PWD Manas Road to Haidar Ali house in Ward No. 1, Barpeta Road under the award of 15th FC 1st installment of untied basic grant for the year 2022-23 during the year 2023-24. (L=125.00 M. B=0.90 M.)

Amount
₹11,89,000.00
Ward Name
1
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC drain with cover slab by the south side of Road No. 46 leading from Mohan Das house towards Ratan Bramha house in Ward No. 2, Barpeta Road under the award of 15th FC 1st installment of untied basic grant for the year 2022-23 during the year 2023-24. (Phase –I) (L=68.00 M. B=0.90 M.)

Amount
₹6,20,000.00
Ward Name
2
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC drain with cover slab and Box Type culvert by the south side of Road No. 46 leading from Mohan Das house towards Ratan Bramha house in Ward No. 2, Barpeta Road under the award of 15th FC 1st installment of untied basic grant for the year 2022-23 during the year 2023-24. (Phase –II) (L=59.00 M. B=0.90 M.)

Amount
₹5,72,500.00
Ward Name
2
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC Road with middle drain covering with slab leading from Deepak Bayan house to Little flower school in Ward No. 3, Barpeta Road under 15th FC 1st installment of untied basic grant for the year 2022-23 during the year 2023-24. (L=62.00 M. B=3.60 M.)

Amount
₹7,60,400.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC Road with middle drain covering with slab leading from Arup Kr. Bayan house to end point of ward no. 3 in Ward No. 3, Barpeta Road under 15th FC 1st installment of untied basic grant for the year 2022-23 during the year 2023-24. (L=37.00 M. B=3.00 M.)

Amount
₹4,32,400.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of CC Paver Block Road leading from Sabur Ali house to Altab Uddin Ahmed house in Ward No. 4, Barpeta Road under 15th FC 1st installment of untied basic grant for the year 2022-23 during the year 2023-24. (L= 100.00 M. B= 3.00 M.)

Amount
₹6,20,000.00
Ward Name
4
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of brick drain leading from ASEB power house to Himangshu Thakuria house (Remaining Part) in Ward No. 4, Barpeta Road under 15th FC 1st installment of untied basic grant for the year 2022-23 during the year 2023-24. (L= 85.40 M. B= 1.00 M.)

Amount
₹5,80,000.00
Ward Name
4
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of CC Paver Block Road leading from PWD main road to MB Road No. 2 infront of Ratan Lal Choudhury (South side of existing road) in Ward No. 5, Barpeta Road under 15th FC 1st installment of untied basic grant for the year 2022-23 during the year 2023-24. (L=95.40 M. B= 6.60 M.)

Amount
₹11,98,600.00
Ward Name
5
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC drain with slab leading from Dr. Haren Choudhury house to BSNL culvert in Ward No. 6, Barpeta Road under 15th FC 1st installment of untied basic grant for the year 2022-23 during the year 2023-24. (L=72.00 M. B=1.20 M.)

Amount
₹11,97,000.00
Ward Name
6
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC cover drain leading from Jagannath Saha house to Radharaman Saha house in Ward No. 7, Barpeta Road under 15th FC 1st installment of untied basic grant for the year 2022-23 during the year 2023-24. (L=107.00 M. B=1.00 M.)

Amount
₹11,98,000.00
Ward Name
7
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC cover drain leading from Ranjit Barman house to Anupam Ojah house in Ward No. 8, Barpeta Road under 15th FC 1st installment of untied basic grant for the year 2022-23 during the year 2023-24. (L=107.00 M. B=1.00 M.)

Amount
₹11,98,000.00
Ward Name
8
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC drain with cover slab by the west side of Road No. 79 and south side of Road No. 43 leading from Swapan Chakraborty house towards Keshab Chandra Bidyalay L.P. School in Ward No. 9, Barpeta Road under the award of 15th FC 1st installment of untied basic grant for the year 2022-23 during the year 2023-24. (L=120.00 M. B=0.90M.)

Amount
₹12,03,000.00
Ward Name
9
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC Road with middle drain covering with slab leading from Ajit Das house to Sukumar Mandal house in Ward No. 10, Barpeta Road under 15th FC 1st installment of untied basic grant for the year 2022-23 during the year 2023-24. (L=100.00 M. B=3.00 M.)

Amount
₹11,93,000.00
Ward Name
10
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Vehicle garage at Barpeta Road Municipal Office campus under 15th FC 1st installment of untied basic grant for the year 2022-23 during the year 2023-24.

Amount
₹10,64,600.00
Ward Name
5
Physical Progress
100
Financial Progress
View on Google Map